Friday, August 9, 2013

Pumps Application in RO Plant

 
send your enquiry to us.
 
Contect Person : Bhalchandra Padwal : Business Development Manager
+91-9967787080 begin_of_the_skype_highlighting +91-9967787080 FREE end_of_the_skype_highlighting (Cell) ( Available when most needed )
optimizesolution@live.com
http://www.optimizesolution.vze.com
https://www.youtube.com/user/bhalchandra74 ( Video Channel of Optimize Solution )
http://www.optimizesolution.wordpress.com
http://www.optimizesolution.blogspot.com
Skype ID : optimizesolution ( Always ready for Help & Business )
Google Talk : balaskyislimit@gmail.com

Wednesday, July 17, 2013

Product Portfolio of Optimize Solution

iframe width 459 height 344 src //www.youtube.com/embed/6ZEtLFdovJc frameborder 0 allowfullscreen> /iframe>

Friday, February 22, 2013

Dosing Skids for Waste Water, Paper & Chemcial Industry


Dear Sir
We would like to introduce our self as fully configurable dosing pump skid supplier for:
  1. Chemical Dosing System
  1. Acid Dosing System
  1. Chlorine Dosing System
  1. Boiler Dosing Chemical System
  1. Poly-electrolyte Dosing System
  1. Ferrous Sulphate Dosing System
  1. Cooling Tower Dosing Skid
  1. Paper Industry Skids
    We also we can supply pump from most reliable brands like
  1.  Metering & Dosing Pump : Milton Roy, Prominent, Seepex, Netzsch, Mono 
  2. Centrifugal Pump for Raw & Transfer Water : Kirloskar Brothers, Grundfos India, KSB, ITT
  3.  Booster Pumps for High Pressure & RO Pumps : Grundfos India, Ebara Pumps
  4.  Waste Water Sludge, Thicken Sludge : Netzsch, Boeger, Mono, Moyno

    ** Domestic Pumps can be made available for highly price conscious customer.
For Water Treatment & Waste Water Application we can supply all types of pump
  1. Feed Water Intake
  2. Transfer Pump at various stages
  3. Booster Application & RO
  4. Pump for handling Sludge ( Primary, Secondary and Tertiary Sludge System )
  5. Dosing and Metering Pumps (Pre polymer, flocculation, pH control etc..)
    If you have any requirement for pump & system, please contact us on 9967787080 or e-mail at bhalchandra74@gmail.com; optimizesolution@live.com


Regards


Bhalchandra Padwal
Business Development Manager






-->

Wednesday, October 17, 2012

Optimizing your Plant and save on Energy

Its an observed fact that ( i.e. Fluid Handling System )
During plant operation there is a waste of energy due to following
  1. Wrong selection on Type of  Pumpset.
  2. Oversize Pumpset Selection.
  3. Wrong estimation of System Pressure 
  4. Pipeline Loss. 
  5. Trying to push up with old out dated equipment.
  6. Motor repair and rewinding 
  7. Using less efficiency equipment  due to low initial cost.
  8. Never considering Life-Cycle-Cost of Equipment 
  9. Throttling Loss not known.
  10. Application Engineering  never consider  
  11. Pre - Maintenance Activities never carried out.  
  12. Old Plant never undergone upgrading. 

We make sure all most all the activities are carried our with support, advice and discussion with the maintenance manager.

Give us a call and we will study your plant for upgrade ( if required ) on Fluid Handling System.

91-99677870808 ( Bhalchandra Padwal )


Diaphragm pumps vs. Peristaltic metering pumps. i

Hello guys


If you are currently using diaphragm pumps in your work and having success the odds are good you are educated on the basics of maintaining your diaphragm pump. I’m also pretty sure the more you learned, the more successful your pumps were…right? Although today’s diaphragm pumps are more sophisticated, better valves, diaphragms, drive mech- anisms, etc. than years ago; they still require a basic understanding for a successful program. Peristaltic pumps on the other hand are initially simpler to use, and require less experience to operate under adverse conditions. This is where we begin:

Diaphragm metering pumps –

Pros
1. Well maintained a diaphragm metering pump cost you less to operate over time.
2. Diaphragm metering pumps are more energy (power) stroke, but far less on the back stroke.
3. Overcoming line pressure is easier with properly sized diaphragm metering pumps.
4. Less danger of leakage - Poorly maintained,  diaphragm metering pump way lose its prime, but seldom leaks, or damages area.

Cons
1. Solution being pumped needs to be clean - diaphragm metering pumps operate best when the solution being pumped is clean, free from particulates. The reason; diaphragm metering pumps have check valves in the suction and discharge side of the pump head. If either set of check valves prime will occur
pumps Prime best when there is little to no back valve to aid in this challenge. phragm pumps prime best when the valves (check balls) are clean and there is little to no back pressure, and the diaphragm stroke is on full or maximum setting. adjustment) is on a low setting. Most diaphragm metering pumps has a diaphragm stroke (feed rate) adjustment, and some also have a motor speed adjustment. Priming is best achieved when the
stroke adjustment is above the 60% area. These adjustments can be confusing, try to minimize your variables as much as possible. Avoid adjusting the diaphragm stroke length to low, the pump loses ef-longer stroke lengths. Insummary (diaphragm metering pump) will require you to be a bit more knowledgeable about